Britannia Acoustic and Fire Ltd were contracted to carry out an intrusive Survey to various location of the building supply samples to our client for analysis. These works were carried out by Abseiling and recorded using of survey and record keeping software.
Project Overview


Removal Process
Britannia Acoustic and Fire (BAF) put together safe systems of work so we were able to Strip the Cladding, insulation and supporting frame work from the building. This intern had removed the flammable products from the elevations affected.
Weatherproofing
With the urgency to remove all flammable materials from the envelope of the building being the main priority, we were able to carry this out and apply Prokol Fireguard Pro 200 which has a class A2 fire-rating. This enable to keep as build weathertight whilst cladding has been removed.

Summary
Britannia Acoustic and Fire Ltd worked closely with the client to understand to needs and goals and to ensure that their building was made safe as quickly as possible whilst having minimal disruption to the tenants.